475

10.

give below original has suffered.

During the relative cost of now to the Estimate, I the and present schemes.

Stew Original Present Scheme in it Storage Reservoir.

Original Present Storage Reservoir 150,000 489,000 bate heater (3) Main to Filter Beds 6,000 40,000 16,000 24,000 (4) Filter Beds & Bungalow 20,000 31,000 For Main from Filter Beds to Service Reservoir 72,000 100,000 (b) Service Reservoir at 60,000 70,000 Kowloon Tong Connection to and Extension of Distributing System. 55,000 70,000 (8) Service Reservoir at Kow. 6,000 7,000 (9) Fire Hydrants on existing system 3,000 4,000 (10) Purchase of cultivated ground 5,000 1,000 (11) Road diversions 5,000 Allow for value of machinery, dispensed with 13,000 303,000 $48,000 13,000 Total $380,000 $535,000

these two estimates, it must be borne in mind that nearly 2 years have elapsed since the original scheme was prepared.

Share This Page