Summary.

Excavator and Drains:

Page 1.

$9,188.75

Bricklayer and Mason,

8.

80,389.42

Carpenter and Joiner,

4.

8,280.24

Plumber.

4.

850.90

Smith and Founder,

5.

4,608.76

Glazier.

5.

38.25

Painter.

5.

828.98

Estimated cost of Tower:

Pier:

Total

$

97,732.4

4,835.11

102,567.51
becomes

Summary.

Excavator and Drains:

Page 1.

$9,188.75

Bricklayer and Mason,

8.

80,389.42

Carpenter and Joiner,

4.

8,280.24

Plumber.

4.

850.90

Smith and Founder,

5.

4,608.76

Glazier.

5.

38.25

Painter.

5.

828.98

Estimated cost of Tower: $ 97,732.4 Pier: 4,835.11 Total 102,567.51 is not needed, simple paragraph is fine. The final output is

Summary.

Excavator and Drains:

Page 1.

$9,188.75

Bricklayer and Mason,

8.

80,389.42

Carpenter and Joiner,

4.

8,280.24

Plumber.

4.

850.90

Smith and Founder,

5.

4,608.76

Glazier.

5.

38.25

Painter.

5.

828.98

Estimated cost of Tower: $ 97,732.4

Pier: 4,835.11

Total 102,567.51

However to follow instruction to the letter

Summary.

Excavator and Drains:

Page 1.

$9,188.75

Bricklayer and Mason,

8.

80,389.42

Carpenter and Joiner,

4.

8,280.24

Plumber.

4.

850.90

Smith and Founder,

5.

4,608.76

Glazier.

5.

38.25

Painter.

5.

828.98

Estimated cost of Tower: $97,732.4

Pier: 4,835.11

Total 102,567.51

Share This Page