Continued.

271

$ 1,244.68

cost rela

SPELE

franes;

4-1/2" x 3" Hardwood sunk, weathered throated and 3 times moulded framed transom

loriidu in hardwood

Ceiling

99 Lin. Ft.

20 No.

.25

24.75

.52

1/2" Trough one side grooved and tonged China fir: ceiling

12.83

398

China fir moulded cornice

297

10.00 Lin. Ft.

.25

74.25

do. air grates 4-1/2" square

18 No.

.09

1.62

Steps to Tower

Trought hardwood framed in beams

7 Ob.ft.

2.00

14.00

1-1/2" do. landing

23 s.ft.

.20

4.60

1-1/2" do. treads

854

No.

.20

170.80

11" x 2" framed string

208 Lin.ft.

.40

83.20

3" x 2" China fir framed rail

162

No.

.10

16.20

4-1/2" sq. do. do newels

11 No.

1.50

16.50

Teak fir:

Lantern

8

.02

.16

Trought hardwood framed

57 Cb.ft.

2.00

114

1-1/4" do do boarding

34 Sq.ft.

.20

6.80

2" do. do. 1 casement

Rolls

13

.40

5.20

24 Lin.ft.

.05

1.20

12" x 8" do. moulded, grooved, sunk weathered and throated: framed cill

Hardwood shaped brackets 3'8" high out of 12" x 13"

152

No.

1.00

152

4' No.

5.00

20

Sundries

1-1/2 Hardwood flap to W.Cs. with out and dished hole and back frame and rubber buffers

5 No.

4.00

20

Paper boxes to #Bs.

1

4'

.50

2

Towel racks

2 No.

1.50

3

Chairs to Waiting Rooms

13 No.

3.00

39

Tables

2

$12.00

24

do. Dressing tables to Lavatory

2 No.

8.00

16

Frames in General Hall

4" x 2" Hardwood, moulded pog nudi°

20 Lin.ft.

.25

5

Ironmonger

6" Wrought iron barrel bolt

18 No.

.16

2.88

do. do.

8" Brass

18 do.

.21

3.78

do. do.

Brass

Wrought iron rackstay

* Rim Locks

16

24'

1.00

16

do. Brass do.

* *

8

9

8

4'

4.50

18

40

17.40

18.00

2,178.94

Continued

Share This Page