erect such a Bilking

A

GW

16/11

Ihr schem

werk being

There is no Jone

by

contract. What is the

objection whatcour to the

Mr Macnaghten

Ag

plean draft the latter part of Migu

your

Mrduces to ser

86

minute, and inn

Camerm's.

Eust

1871.

most peceral practice, in the Straits & checuture, the PW.D. inseriricing till contracter,

the

It appears possible for the for? Despatche that he contemplates placing the unide matter, including preparation & of contract, invitatio

to souber

& selection

entractor, & super-

vivim of work, in hands

am ust sure that this is

f

architects, I

but lives 5

6e of para. 6 rather point to it, apparently think es. This wond est be a

desirable method. He fructives

for

fine.

tthe

2

PWD

architects old be confined to preparation of designs, working draurige, & ehreifintion, aspecifications, 4. this might acting as Consulting Architects

reference during construction: the shd make all the business arrangements including terms of contract, &

carry work, referring to the architects on points of doubt. Probably the Archts had better prepare the estimate, but the Ph.D. and check it

out the

17

Share This Page