13

ten sections, cach controlled by a switch.

The Camps

are

placed about 144

feet above the floor level.

The current is reduced from

2,000 to 100 volts

CL

entering the consumption with

premises, and the all the lamps turned

11.2 Bourd

of

OLL

is about

trade units per hour.

17. Completion. The building

-pleted and opened

w Com -

the 1th of May

lash, the total cost being

Site

$158,058:00

Foundation,

$ 35,958.54)

Superstructure. + $220,262-06

258,000.00

fittings.

Electric Light Justallation, $ 1, 7489.40)

Total $416.058 · 00

I have the honour to be,

Sir,

Your most obedient servant.

Mancis Mother

Director of Public Works.