13
ten sections, cach controlled by a switch.
The Camps
are
placed about 144
feet above the floor level.
The current is reduced from
2,000 to 100 volts
CL
entering the consumption with
premises, and the all the lamps turned
11.2 Bourd
of
OLL
is about
trade units per hour.
17. Completion. The building
-pleted and opened
w Com -
the 1th of May
lash, the total cost being
Site
$158,058:00
Foundation,
$ 35,958.54)
Superstructure. + $220,262-06
258,000.00
fittings.
Electric Light Justallation, $ 1, 7489.40)
Total $416.058 · 00
I have the honour to be,
Sir,
Your most obedient servant.
Mancis Mother