O
Jov
14276
go
to navigation by
which frequent that Port.
17
the
small craft
Sords
my
your
letter
the 30th
of
I
am to add that
observe, from the enclosure to
4 July, 1890, that
the cost of a permanent breakwater
was estimated by
at
$150,000, and
the
Surveyor. Gineral
and that the cost of
the bas complete junk obstruction
is now
placed at $234,000.
I am, Sir.
Your obedient Servert,
Evan Markeper