O

Jov

14276

go

to navigation by

which frequent that Port.

17

the

small craft

Sords

my

your

letter

the 30th

of

I

am to add that

observe, from the enclosure to

4 July, 1890, that

the cost of a permanent breakwater

was estimated by

at

$150,000, and

the

Surveyor. Gineral

and that the cost of

the bas complete junk obstruction

is now

placed at $234,000.

I am, Sir.

Your obedient Servert,

Evan Markeper

Share This Page