are
arranged
main bui
to the west of the
building
and to a
extent screened from it
large
by the
projecting intervening spur of the
hill.
The plans I think
sufficiently explain
7.
ment
to require
8.
of
the
the
arrango-
rooms and offices as no detail description.
The buildings
are pro-
posed to be constructed of red
the
Canton bricks and plastered on outside in accordance with the
general custom prevailing
Colony.
9.
in this
All main beams and
verandah joists
are to be of iron
to afford a protection against the ravages of white auto in those portions of the buildings
from experience they
where
have been
I found to be most disastrous.
10.
It
418
It is further proposed
to
lay
с
gas and hot and cold
water hroughout the building; the
boiler
for the hot water service.
for
being fixed in the kitchen.
11.
The following
is an
approx, in ate estimate of the cost of the proposed project
Cosh
of Preparation of
site/from actual tender)
Cost
of superstructure ess sundries ben/kom
achia Lender)
as
}
86,255
Laying on and providing &
gas
littings for water and, Providing and fixing election
bells
colled)
undry fittings, glas, olled) Joisto re to be provided, de- partmentally
Lacping out grounds way
43511
3154
250
6830
$60,000
2.000
$62,000