gauge basin will be constructed. un steps which will secure the

additional advantage of further aerating the waters before entering

the tunnel.

157

The water will be con-

veyed across the overflow channel in

a cast iron.

diameter.

16.

10 inches in

Enclosure 3.

Public Works Department

No217

16545

Rest 15 100 32

533

Surveyor General's Office.

28th March

1892

đông trong

Sir

1.

respecting

the

improvements

of

the Recreation

Adverting to previous correspondence

ground Happy Valley I have the honour to report that the work I consider absolutely

necessary

to

provide for the better drain this Valley which is annually flooded

exphon

drainage

f

Imall dams will be

during

owing

free outlet is

to the subsoil Government

constructed of concrete and masonry

across the stream at the

of

upper

end

the reservoir forming suitable

uitakes

for collecting

work is $4,0

the clean water.

The estimated cost of this

4,000.

We have &

Biqued / H. E. Crow,

Goot Analyst.

(").

F. A. Cooper,

Sirector of Public Works.

Hon: G. J. M. OBrien, C. M.G.

"Colonial Secretary

the

heavy rains drainage carried out by in 1889 not having (a) The lowering of a portion of

a

X

the weir

at the point marked & on the enclosed plan and

and

(4) The narrow anal betpening of 1

existing

X and Y.

2.

3.

This work is a

the

the points

modification of

The

the Late Surveyor

General for

balance

a

of

$24.821.180

the

out

the sum

remaining portion of the more extensive scheme proposed by

which

sum voted viz $40,000. for

"Improvements Recreation Ground Happy

ValleyTM

$13,000.

The Honourable

remains.

I estimate the cost

The Colonial Secretary

of

the work at:

The