34.
35.
degree of certainty.
The Lighthouse
within
a
ward
521
• practically completed : period of 23 months, viz : by the first of April when the light was first lit and the "Fame" offered for sale. Since that date the "Fame" has been maintained as the light- -house tender and for the purpose of conveying material for the extension rendered necessary by the
improved signalling of ships being
decided on.
The additional cost incurred.
owing to
the extra two months required to complete the
lighthouse is as
follows:
36.
viz:
Maintenance and running of
Fame including Insurance. Salary of Overseer
$2,100.
$240.
Jotal $2,340
originally
Additional works to those
Estimated for have been found necessary.
2070
" Condensing Apparatus C.S.O. 90
Permanent Crane for landing C.S.0.107374 $ 400.
Flagstaff Fog Signal
$1,900.
C.4.0.1026 $ 350.
C.5.0 882
92
approximate $1,000.
$3,650.
37.
38.
Additional cost of maintaining and
running the "Fame" since the 1st of April to 31st of May
of May $2,000.
The expenditure for providing and fixing of the Fog signal has yet to be incurred. The apparatus not
apparatus not yet having
arrived.