8.

9.

10.

11.

517

constructed, if at all at anything like the figure named in the Estimates.

12.

Until detail which would occupy.

Surveys

have been made

a considerable time.

I do not feel justified in submitting any Estimate of it's probable cost or

stating

definitely that the construction of such a road is practicable.

In respect of

13.

the

remaining works

year's Estimates I submit

appearing in this that the most urgent

are

(28) Gaol Extension.

(33.) Reconstruction of Governor's Peak Residence. 146.) Kowloon Water Supply .

(9.) Improvements Recreation Ground Happy Valley.

The best practical means of complying with the Secretary of State's instructions respecting the Extension of the Gaol is receiving my most careful attention, but a great deal of information is required and accurate plans of the existing buildings must be prepared before

I

position to submit. definite project and estimate the cost

of of effecting this however inserted this work.

am in a

a

have a sum

of $60,000 in next year's estimates which will

I think meet

1893.

any probable Expenditure in

Plans have been prepared for the reconstruction of the Governor's Peak Residence and the question of the most suitable site and the cost of preparing the same is now being considered.

arm

unable at present to submit

3.

а

Share This Page