8.
9.
10.
11.
517
constructed, if at all at anything like the figure named in the Estimates.
12.
Until detail which would occupy.
Surveys
have been made
a considerable time.
I do not feel justified in submitting any Estimate of it's probable cost or
stating
definitely that the construction of such a road is practicable.
In respect of
13.
the
remaining works
year's Estimates I submit
appearing in this that the most urgent
are
(28) Gaol Extension.
(33.) Reconstruction of Governor's Peak Residence. 146.) Kowloon Water Supply .
(9.) Improvements Recreation Ground Happy Valley.
The best practical means of complying with the Secretary of State's instructions respecting the Extension of the Gaol is receiving my most careful attention, but a great deal of information is required and accurate plans of the existing buildings must be prepared before
I
position to submit. definite project and estimate the cost
of of effecting this however inserted this work.
am in a
a
have a sum
of $60,000 in next year's estimates which will
I think meet
1893.
any probable Expenditure in
Plans have been prepared for the reconstruction of the Governor's Peak Residence and the question of the most suitable site and the cost of preparing the same is now being considered.
arm
unable at present to submit
3.
а