}

704

and Pig Depôt at Kennedy Town, by somewhat reducing

the shed accommodation.

for animals.

9

may mention that

both these works are

do

were

regarded

• of very urgent necessity, and the designs originally prepared to - furnish as far as possible

the accommodation considered

necessary by the Danitary Board, who will have charge of the buildings.

These

works

works were commenced last

year .

As regards the Central Market, which is also a very urgently required improvement, and a building

which it must be remembered will be of a remunerative -nature, the greatest saving

on the original estimate that the Surveyor General has - ang total found it possible to devise #h27-ris one of $20,000.

The design of Mr Wills,

In

Share This Page