362
on his arrival, I called special attention to the wuidoos and the towers with a view to their
done by
a
miprovement. This can be readily
careful study of details, without introducing radical changes
ice
adapted to the climate.
Nite I.
مدگی
save time I
proposed to make one contract for the mani building,
and to postpone contracting for the erection of the
crannwork and s
- shop fittings (to be
obtained from England) until
definitely settled.
the details were
This cannot be done
}
{
or save
for
time, as it involves a
further
communication with the Acron
Agents.
Ar additional reaser.
I have for not viduding the iron-
fittings in the
desk avva
same
contract
Note I.
being effective,
and what seaus.
to me to be a treatment lacking in character are I think its chief faults.
So large
te
building in
so fire a situation could I thunk
be made to look
very
well withere
more detail than as shown.
The foregoing
are
the
chief points in which I thunk the
present scheme defective.
estimates
for
It is proposed to obtain
the shell of the building
only and to settle details afterwards including them in subsequent
contacts which seems to me to be
a mistake as there is.
hardly
detail which
may
not ui somme
way affect
the
general
al scheme
and be considered at the outset.
with advanta
advantage.
The whole of the
Les and
stail fittings, gates
the
-arrangement
railings,
and positori of
the Sanitary apparates, the water
supply
}
Y