organisation of

the staff of the

Public Works Department. Among the proposed officials

was an Architect.

III made this proposal from the - consideration that however experienced. other officials of the Public Works Department uniight be as. regards :local buildings and methods of construction, it appeared to me desirable, taking into account the magnitude

ide and importance of

some of the new

buildings proposed,

that the Surveyor General shoula

have the assistance of

a trawied

architectural Assistant with a view.

to the miprovement of the designs from an artistic point of view. Subsequently, after some 18 months

had clapsed,

of

as

the

designs of some

had already been

wing of

these buildings prepared, and the new

Government House was

Corr

nearly

mpleted from the designs of Messrs

327

Palmer and Turner (who had been

called in to assist the

General) I suggested

economy,

Surveyor

with

view

that the experiment

should be made of dispensing with

the service of

suggestion

an Architect. This-

was however made too

late, as in the meanwhile the

Crown Agents had under an Agreement dated the 10th December

Mr Wills for 1890 engaged period of 3 years

ao

ta

Architectural

Assistant, the agreement expressly stating that he will be placed "under the orders of the Surveyor

"General of

the

3

Colorry. Accordingly.

ar

Adr

placed

Wills arrival I at once.

the

designs of

the Central Market un

ad

his hands, with a request that he would complete them as carly possible. As the

general design had received the approval of Government,

Palmer

and

:

Share This Page