4

10,

Contract No. 108809 for constructing a Dust Bin

in Victoria

1884 for extending the Breakwater

at you ma......

ow

1884 loss of building materials

taken over from the Contractor

14

and indemnity to him consequent on the cancellation of the said contract

- 7854 for lengthening the Skew

27

450

455

9006 54006

1500

7000

740

3240.

Bridge at Causeway Bay 500

1884 for Constructing a Sand pit ventilation shaft, and flight

of steps

on Robinson Road

|

970

500

1000

at the junction of Peel St.

1000

31

1884 for constructing a public

4

Latrine at the Recreation ground

1884 for building a public Latrine on the vacant ground below No. 9 Tank, Tai ping shan

Forward

1500

1000

1000

800

20057 550057

1000

1000

300

2300

1800

1475063

Share This Page