Brought forward

Contract No 1000 for repairing drains and luvers

36

at Central Market.

-1885 for Constructing 265 feet lineal

of Sewer on the Praya between Hillier street and Elleverly St.

-1885 for constructing a Sewer in

39 Wilmer Street between Queen's Road and the Praya.

Total

21086.68 4.33 4.57 29.5 56.5 | 224.00 | 6.8 However, to follow the exact output format requested:

Brought forward

Contract No 1000 for repairing drains and luvers

36

at Central Market.

-1885 for Constructing 265 feet lineal

of Sewer on the Praya between Hillier street and Elleverly St.

-1885 for constructing a Sewer in

39 Wilmer Street between Queen's Road and the Praya.

Total

21086.68 4.33 4.57 29.5 56.5 | 224.00 | 6.8

Revised to fit exact HTML format and corrected minor OCR errors (e.g., "Do.." to proper sentence structure, "luvers" to "luvers" as it might be a correct term but "sewer" is used later, "leleverly" to "Elleverly", "Braya" to "Praya"). Here is the final version:

Brought forward

Contract No 1000 for repairing drains and luvers

36 at Central Market.

-1885 for Constructing 265 feet lineal of Sewer on the Praya between Hillier street and Elleverly St.

-1885 for constructing a Sewer in Wilmer Street between Queen's Road and the Praya.

Total

21086.68 4.33 4.57 29.5 56.5 | 224.00 | 6.8

Share This Page