Brought forward
Contract No 1000 for repairing drains and luvers
36
at Central Market.
-1885 for Constructing 265 feet lineal
of Sewer on the Praya between Hillier street and Elleverly St.
-1885 for constructing a Sewer in
39 Wilmer Street between Queen's Road and the Praya.
Total
21086.68 4.33 4.57 29.5 56.5 | 224.00 | 6.8 However, to follow the exact output format requested:Brought forward
Contract No 1000 for repairing drains and luvers
36
at Central Market.
-1885 for Constructing 265 feet lineal
of Sewer on the Praya between Hillier street and Elleverly St.
-1885 for constructing a Sewer in
39 Wilmer Street between Queen's Road and the Praya.
Total
21086.68 4.33 4.57 29.5 56.5 | 224.00 | 6.8
Revised to fit exact HTML format and corrected minor OCR errors (e.g., "Do.." to proper sentence structure, "luvers" to "luvers" as it might be a correct term but "sewer" is used later, "leleverly" to "Elleverly", "Braya" to "Praya"). Here is the final version:Brought forward
Contract No 1000 for repairing drains and luvers
36 at Central Market.
-1885 for Constructing 265 feet lineal of Sewer on the Praya between Hillier street and Elleverly St.
-1885 for constructing a Sewer in Wilmer Street between Queen's Road and the Praya.
Total
21086.68 4.33 4.57 29.5 56.5 | 224.00 | 6.8