Brought forward.

Contract No 1886 for constructing a Sewer in Queen's Road East near St. Francis street.

1886 for constructing 650 ft. lineal of new Sewer in front of Marine Lots No: 20 and 21 at Tsim Sha Tsui.

Test for the construction of an open stone Nullah at Kowloon.

1886 for repairing, widening and Channelling a portion of the Shau Ki Wan carriage road at Quarry Bay.

1885 for reforming, channelling and macadamizing about 2000 feet lineal of Bonham Road from the top of Centre street to the junction of Pok Fu Lam Road.

1885 for repairs to Robinson Rd. between Peel street and Castle Road.

Forward.

62 28 404 31 701 03 43 48 40 850 751 9257 600 925 1525 1000 625 43 1500 870 2370 4209348 3484848 Do.. Do.. Do. De. Bod. Do. However, to follow the exact output format requested (HTML using

for paragraphs and
only if necessary), the corrected version focusing on the text content is:

62

28

Brought forward.

Contract No 1886 for constructing a Sewer in Queen's Road East near St. Francis street.

-1886 for constructing 650 ft. lineal of new Sewer in front of Marine Lots No: 20 and 21 at Tsim Sha Tsui.

43 -Test for the construction of an open stone Nullah at Kowloon.

1886 for repairing, widening and Channelling a portion of the Shau Ki Wan carriage road at Quarry Bay.

40 -1885 for reforming, channelling and macadamizing about 2000 feet lineal of Bonham Road from the top of Centre street to the junction of Pok Fu Lam Road.

625. 43 Do. 7885 for repairs to Robinson Rd. between Peel street and Castle Road.

1500. 870 2370 Forward.

4209348

But to make it more readable and follow the original structure as closely as possible while still adhering to the requested format, we simplify it to:

Brought forward.

Contract No 1886 for constructing a Sewer in Queen's Road East near St. Francis street.

1886 for constructing 650 ft. lineal of new Sewer in front of Marine Lots No: 20 and 21 at Tsim Sha Tsui.

Test for the construction of an open stone Nullah at Kowloon.

1886 for repairing, widening and Channelling a portion of the Shau Ki Wan carriage road at Quarry Bay.

1885 for reforming, channelling and macadamizing about 2000 feet lineal of Bonham Road from the top of Centre street to the junction of Pok Fu Lam Road.

1885 for repairs to Robinson Rd. between Peel street and Castle Road.

Forward.

Given the numbers and the structure, it seems like the original text was a mix of numerical data and descriptive text, possibly from a ledger or a report. The numbers were presented in a way that suggests they were part of a table or a list. However, without further context, the exact nature and relationship of these numbers to the text are unclear.
Share This Page