79

10

Brought forward-

Contract No 1886 for constructing concrete side channel along the Kowloon Praya between the Naval Coal Sheds and Chater Street

403

|| 2 3 3 5 6 48

5001

535

1035

23

Do -1886 for constructing a Lewer at Jardine Sugar Refinery East Point

2500

24

2376

4875

24A

78

1886 for the construction of a Main Sewer and repairs

59

Do..

24 B

to pavements in Sing Wong Street Tai ping shan.

1886 for constructing drains and surface channels to Hospital Garden.

1886 for constructing 718 feet lineal of Lewer and for raising and reforming 735 feet of Middle street.

1981

25

2260

722

1000

1000

2000

08

27

Dc.

106 for constructing a Sewer from Hill Street #Shek Tong Tsui to Tai Ping Shan Nullah.

Boc.

300

600

Forward.

3484848

Share This Page