79
10
Brought forward-
Contract No 1886 for constructing concrete side channel along the Kowloon Praya between the Naval Coal Sheds and Chater Street
403
|| 2 3 3 5 6 48
5001
535
1035
23
Do -1886 for constructing a Lewer at Jardine Sugar Refinery East Point
2500
24
2376
4875
24A
78
1886 for the construction of a Main Sewer and repairs
59
Do..
24 B
to pavements in Sing Wong Street Tai ping shan.
1886 for constructing drains and surface channels to Hospital Garden.
1886 for constructing 718 feet lineal of Lewer and for raising and reforming 735 feet of Middle street.
1981
25
2260
722
1000
1000
2000
08
27
Dc.
106 for constructing a Sewer from Hill Street #Shek Tong Tsui to Tai Ping Shan Nullah.
Boc.
300
600
Forward.
3484848