80

with the order list supplied

Surveyor G.

berg.

the

eneral, not having

the plans before

or c27cci cord, ad

Atie

KCSE JE

eve their present stage. I for instave

wish to know definitely if or not

oir, the tunnel and the

norobe

w be

conduct, are

sound and water-

نیم مجھے وسیع

their way

light. This information I ha

میسیج کا سر من

at vederstand, these a

to England, it may

inod advisable to wait their

arrival when they

wat

feebly.

examined.

C

te care

It is both a mistake and a

- misfortune to have had the plans

long delayed,

delayed, as the price for

so

APONAS Qd cance

ng

:req-

but there

would probably be more lossan

random orde.

ordering

than

waiting for definile informa

tion. The worksure in a serious

crisis.

the

mich depends upon.

بره شیخ مجھے چھو کر ہی ہوا ہے

اری

cce

of

caling with them

never fra d

even crea

طاری کر کے

satisfactory consequently

deg

i. Jami

an Alio dark a vod in

in doubt As the tunnel

is not lined, it may, I have no doubt, be absolute by safe, but it may not at the same time, be absolutely watertight. The em-

ban

nent wall is strave no

doubt both sound and sai.

it fe, but there may be loss of water,

from the site of the reservoir through

atural fissur

es in the

the Granite.

ury

gn

me

fise:

N

Share This Page