80
with the order list supplied
Surveyor G.
berg.
the
eneral, not having
the plans before
or c27cci cord, ad
Atie
KCSE JE
eve their present stage. I for instave
wish to know definitely if or not
oir, the tunnel and the
norobe
w be
conduct, are
sound and water-
نیم مجھے وسیع
their way
light. This information I ha
میسیج کا سر من
at vederstand, these a
to England, it may
inod advisable to wait their
arrival when they
wat
feebly.
examined.
C
te care
It is both a mistake and a
- misfortune to have had the plans
long delayed,
delayed, as the price for
so
APONAS Qd cance
ng
:req-
but there
would probably be more lossan
random orde.
ordering
than
waiting for definile informa
tion. The worksure in a serious
crisis.
the
mich depends upon.
بره شیخ مجھے چھو کر ہی ہوا ہے
اری
cce
of
caling with them
never fra d
even crea
طاری کر کے
satisfactory consequently
deg
i. Jami
an Alio dark a vod in
in doubt As the tunnel
is not lined, it may, I have no doubt, be absolute by safe, but it may not at the same time, be absolutely watertight. The em-
ban
nent wall is strave no
doubt both sound and sai.
it fe, but there may be loss of water,
from the site of the reservoir through
atural fissur
es in the
the Granite.
ury
gn
me
fise:
N