21

22. Turning now from the creditor to the debtor side of the Project, I find the cost of the Naval Yard Sea-wall, roadway, basin, and other improvements is about $300,000.

23. The cost of the works opposite the Military Cantonments is as follows:

1. North Barracks Reclamation.

Embankment, Filling in,

$66,000 .$54,000-$120,000

ii. Commissariat Reclamation (including one half width of

Commissariat Lane),

Embankment,

Filling in,

iii. Wellington Barracks Reclamation.

Embankment,

Filling in,

iv. Arsenal Reclamation.

Embankment, Filling in,

(

..$21,000

.$13,000—$ 34,000

.$42,000

.$28,000=$ 70,000

.$58,500

.$37,500-$ 96,000

Total...........

.$320,000

24. The cost of embankment and filling in opposite Mr. SHARP'S lots 20 and 21, including the remaining half-width of Commissariat Lane extension, amounts to $21,000.

25. That of the embankment and reclamation (including the making of Arsenal Road) opposite the Blue Buildings comes to $50,000.

26. From the preceding figures it will be seen that the realization of the embankment project will cost a total of $691,000 of which amount $300,000 will be absorbed by the section in front of the Naval Yard and the improvements to the latter, while $320,000 will go to those portions of the work situated in front of the Military lands. Of the remaining $71,000 a proportion of $21,000, would have to be paid by Mr. EDMUND SHARP on account of his lots 20 and 21, and the balance of $50,000 by the Colony on account of Arsenal Road Extension and the triangular reclamation opposite the Blue Buildings.

27. If the War Office therefore reclaims at a cost of $320,000 the areas valued in paragraph 19 at $1,325,856 it will derive a net profit of over one million of dollars.

28. I do not enter in detail here into the question of the contribution that should be asked of the Admiralty in return for the extensive improvements which the scheme promises to the Naval Yard, but looking to the extremely onerous conditions which have been imposed on the Colony by the local Naval Authorities in this matter-regardless of the attendant expense-in respect of subways, quays, deep water pier, boat-basin, &c. it would only seem fair if the Admiralty will not pay the whole of the $300,000 that at least a very substantial contribution should be made from Admiralty funds. The naval foreshore is now in so silted a condition as to threaten to seriously impair the usefulness of the yard within the next few years, and if any considerable sum is to be spent by the Admiralty in works of partial relief as most assuredly will have to be the case if the proposed embankment is not made it will be far preferable to devote such sum as a contribution to the Colonial Government scheme because the latter guarantees a more permanent and efficient remedy than will be ever likely to be found in mere palliative measures taken singly by the Admiralty.

29. The estimates of cost given here though not professing to be more than preliminary or approximate have been worked out sufficiently in detail to enable the Departments to adopt them as the basis of any arrangement that may be con- templated with regard to the share of the expense to be borne by the Imperial and Colonial Governments respectively.

I have the honour to be,

Sir,

Your obedient Servant,

J. M. PRICE,

Surveyor General.

PRAYA JUNCTION WORKS, HONGKONG, 1888.

Approximate Estimate of the cost of constructing 2,822 lineal feet of em bankment wall with a 75-foot roadway complete, for reclaiming 599,904 Square feet of foreshore and of making a boat-basin containing 84,540 Square feet.

North Barracks Reclamation

Embankment and works, Filling in

Naval Yard Reclamation

Embankment, basin, works, quays, sub-7

ways and filling in

.$ 66,000 54,000

$120,000

300,000

Commissariat Reclamation

Embankment and works, Filling including

.$ 21,000

width of street,

13,000

34,000

Marine Lots 20 and 21 Embankment,

.$ 8,000

Filling including width of street,

13,000

21,000

.$ 42,000

28,000

70,000

.$ 58,500

37,500

96,000

.$ 40,900

9,100

50,000

$691,000

Wellington Barracks Reclamation

Embankment and works,

Filling in,.

Arsenal Reclamations

Embankment and works, Filling in,

Arsenal Road and Blue Buildings Reclamatiom,

Embankment and road works,

Filling in,.

Total cost,

TABULATED STATEMENT OF AREAS TO BE RECLAIMED AND MADE AVAILABLE FOR BUILDING PURPOSES UNDER THE PROPOSED

PRAYA JUNCTION SCHEME TOGETHER WITH MARKET VALUE OF THE LAND.

North Barracks (Military),',

Royal Naval Yard (Naval),.

Commissariat (Military),'

Commissariat Street (Colonial),

Lots Nos. 20 al 21 (Mr. Sharp),

AREA

OF

PROPOSED

PRICE

PER

TOTAL MARKET VALUE OF

TAR

SQUARE FOOT.

RECLAMATION.

RECLAMATION.

184,215 Sq. ft.

$3.00

$402,645

52,264

$3.00

">

$156,792

45,953

$2.50

J

$114,882

14,607

Not saleable.

23

53,383

$2.50

Wellington Barracks (Military), .

149,036

$2.50

71

$372,590

Arsenal (Military),

124,497

$8.50

$485,739

Arsenal Road Extension (Colonial),

9,000

Not saleablo.

T

Blue Buildings (Colonial),

17,309

$3.50

$60,581

600,264 Sq. ft.

وو

$

$133,457

1,676,686

J. M. PRICE,

Surveyor General.