the reports of Military Authorities to be by the construction of

permanent rough stone breakwater,

and the cost

I would

of

such

a work

be less than that of

obstructions by junks laden with stones which I understand

would not be regarded as

such

permanent character

4.

C

219

maritime station.

There

is a material difference

however between the Estimate of the cost of this breakwater made by the Commanding Royal Engineer and by the Surveyor

General and as the latter is

an actual tender

I am

of opinion

that it will

be

better to leave

A

report

received from

opening of 1,000 yards between

the Southern end of the

breakwater

As

and

Green Island

there is reason to fear

that

if passage closed it might tend to the shoaling up of a portion of

the harbour, which would

be fatal to the prosperity of Hongkong

A

great

maritime

of

the most

reliable of the

Contractors, I think that it

may

be accepted as

the

accurate of the two.

The Estimate

of

this

breakwater 2,000 yards in

length and brought up to

the level of low water $150,000

6.

The scheme

for blocking

Kellett's Bank with sunken

junks filled with stones which has been prepared by Colonel Storer is estimated by

him

to