Tyram Junnel.

Hong Kong Water Works.

Detail of Work and Expenditure during the mouth endring

Length of Tunnel dreven during the

Mouth in Lirical Beet. 183.

30th of Novt 1885-

Number Classification of Labour

Outlay during

and materialo -

Rate

the Mouth-

Labour employed.

#.

مجھ

during the mouth.

Machinemen (Natives) Paid by Contract)

6

50

per shift of 8 hours.

at: 45° per foot

823

60

/33

16.5

20

Labourers.

Eineal of tennel

Smiths

oof penday

Compressors.

Store Boys.

Hammermen.

Eugniemen with

European Foremen

fitters and miners

407.7.

247

80

40

54

50€

20 to 30€

averaging each per

mouth.

#176.

884

83

143

151 A

Materials expended

during the mouth.

ebe

1550 Dynamite

@ #

0.62

962

SE

146

my

do

cores

326

Fuse.

0.33

109

90

17

108

#

3000 Detoriators

1.00

30

60 gale oil.

1.75

105

17

६३

??

llos.

420 Candled.

0.22

92

45

5

75 lbs. Waste

0.

/2

9

9 3

130 tona bual.

#

10.00

13.00

261

510

+

Total.

# 4568-19

742. 6. 7

Equi alent