all the difficulties into consideration I cannot say that it is more than Circumstances warrant.
The dam. wall will be ready,
or may
be ready, before the Tunnel -
The Surveyor General
May 20
the work on the dam as
arrauge to be
indeprudent of flood over flows, by
keeping a portion of
down as a
the wall
overflow. I will prepare
a diagram and instructions as to
this
for
the
Surveyor General.
Yours Tr
(8d, Robert Rawlinson
ce or Individual.
Agents
Date.
1885
7 Sept
previous Paper.
quits
15494
Copy Encl. for. w/ 52-14 feft;
14 Sept.
*
مسه
subsequeus-Paper
19747
Hồng trong
No. 16024
(Subject.)
270
DOMESTIC.
C O. 16027
IRECT O
REGY & SEP JO
Cement for Jytam Works
Copy
letter
from Consulting
Engineer, fiis arguments agt rxfectioner,
of purchasing it locally.
(Minutes.)
Mr Meade
Similar remarks were made by
the Agents on the onbject of Portland Cement in the minutes
Strait
51727/2
?. Send copy of Sir R. Rawlinson lester to foverer for informer. with reference to par. 7 of dept.
to I
deaft dsmbodzin
-15340,
the views here expressed by the Agents
Sr. J. 8 Sep.
and 8/9
Run P/q