together with copy of ofurther observations referring to a progress report received by the C.Agents direct from The Colony, for the quarter ended 30th June last.

2. You will see that

Si R. Rawlinion is generally satisfied with the mann

which the work has,

af to the date of the report, been carried

out

WWW. Price, but

hans

he wes

To upis

the

absolute necessity of

*

the Dambeing

way

trilt in the

he describes, as shown

in the accompanying

insistimages.

261

tracing, & that the umer

should

Jam shall be

face of the dau

made perfectly water tight

вза

of Portland

by a liberal use Coment. The Consulting

Engineer is also unable

to consent both Surveyer General's proposal to use Chuière hydraulic lime concrete for the upper- part of

the Dam, the

points out that the use

the best materials now will in the end prove the truest Economy, as if by the

lise

a

of inferior materials leakage shant's hereafter

Occur