together with copy of ofurther observations referring to a progress report received by the C.Agents direct from The Colony, for the quarter ended 30th June last.
2. You will see that
Si R. Rawlinion is generally satisfied with the mann
which the work has,
af to the date of the report, been carried
out
WWW. Price, but
hans
he wes
To upis
the
absolute necessity of
*
the Dambeing
way
trilt in the
he describes, as shown
in the accompanying
insistimages.
261
tracing, & that the umer
should
Jam shall be
face of the dau
made perfectly water tight
вза
of Portland
by a liberal use Coment. The Consulting
Engineer is also unable
to consent both Surveyer General's proposal to use Chuière hydraulic lime concrete for the upper- part of
the Dam, the
points out that the use
the best materials now will in the end prove the truest Economy, as if by the
lise
a
of inferior materials leakage shant's hereafter
Occur