245

9

approve of the Surveyor General's proposition to

temporarily impound the water, and use it in a Turbine for giving additional power to the Boring

operations in the Tunnel-

It is

my

PO"-

desire that the Dam should be carried up

the full contemplated height

so that the permanent -

lue wash

may

be available.

"E

The method of dealing with the springs opened

out in the side excavations is satisfactory.

More

The Tunnel operations appear to be proceeding

satisfactorily than heretofore. The Surveyor

General states in his report that "the progress has been

nearly doubled "since the adoption of the new ave

compressors and the larger Drills. It is not however

stated what the actual rate of progress is

progress is per week,

this should be clearly stated in the next report.

a condition of

The Surveyor General,

assunung

things