Bir Robert Rawlinson to

C. O.

14254

The Crown Agents

GEGA 220UG 23

292

20% August 1804.

In reply to the suggestion by Mr Price to use lime morter to be obtained in the District, in the construction of the Tylam Reservoir Damn, in place of

Portland Cement. Icannot consent to the proposal that the wall should be homogeneous,

It is of the utmost importance

and that

the cement should be the best. I must, therefore, insist on a continual use

continual use of Portland bement. Midfather and other castings

On the 18 & 19th instant in company with Mr Harry Stänger, I visited Mess: Guest and bhrimes place at Rotherham, and inspected the the

fitting up will be proceeded with at once. CM: Stänger willl arrange for an inspection of the casting, and enquire do to the earliest period for shipment of the bottom plates

them sent out to Hong Thong and avoid delay.

Midleather, and the casting and atterns for the

امه وه

Inlet pibes to the Valve-Well

An estimate will be submitte a for these pipes,

covering plates and copper screens at once, so that the two or three lower bikes

with the Coltom mixfeather plates.

will

you

out

please to communicate these details to one Price by the next foot, and ask him for plates of the site and bank as for as executed! Specimens of the material from the tunnel were also promised. There may be sent

small

a

case -

(39) Robert Rawlinson

1