20% August 1804.
In reply to the suggestion by Mr Price to use lime morter to be obtained in the District, in the construction of the Tylam Reservoir Damn, in place of
Portland Cement. Icannot consent to the proposal that the wall should be homogeneous,
It is of the utmost importance
and that
the cement should be the best. I must, therefore, insist on a continual use
continual use of Portland bement. Midfather and other castings
On the 18 & 19th instant in company with Mr Harry Stänger, I visited Mess: Guest and bhrimes place at Rotherham, and inspected the the
fitting up will be proceeded with at once. CM: Stänger willl arrange for an inspection of the casting, and enquire do to the earliest period for shipment of the bottom plates
them sent out to Hong Thong and avoid delay.
Midleather, and the casting and atterns for the
امه وه
Inlet pibes to the Valve-Well
An estimate will be submitte a for these pipes,
covering plates and copper screens at once, so that the two or three lower bikes
with the Coltom mixfeather plates.
will
you
out
please to communicate these details to one Price by the next foot, and ask him for plates of the site and bank as for as executed! Specimens of the material from the tunnel were also promised. There may be sent
small