4

7

a careful watch on its

With

its progress. my despatch W: 316 of 28th

11:516

November, 1883, I transmitted a

Report from the Surveyor-General

mr

(Mr Price), and I now transmit a further Report, showing the

progress and present condition of

the Tytam Water Works. I have

personally visited them on

several occasions.

4.

request particular

attention to the statements of Mr. Price in the enclosed Report. It will be seen that it is not now

expeated

Epu

447

83-4

Enclosure.

expected that the tunnel which is

the water to the town

to convey

from the principal reservoir can

be completed before 1887.

5.

It is feared that

this important Public Work-will, owing to unexpected difficulties that have arisen, exceed the

کو

original estimate both in cost and in the length of time required for its completion. On the other hand, it is argued -

that the population and the -

amount of shipping to be

supplied