358
absorbed in preparing the sites which school, for him a house. may be built is sleep as a house roof. a 024 the plot of ground. shown hinted green in Drawing h: 1. This ground, which is steep hill slope is the property of the Government.
12. The estimated cost of the new school building is $100,000 That of a stand master's re- Head sidence consisting of four rooms and suitable out-offices, the ordinary type of European time. ment in Hong Kong will Comb to an additional $11,000. Of this figure # 2,000. will be absorbed
13. In conclusion I must not fail to point out, with reference to the arrangement proposed for the new School building and ground, Goulding and that although it would have been decidedly preferable for the sake of better ventilation and drainage to have built the school on slope instead of putting it under the lee of A 14 excavation and pelaming wall, this hav not bun possible in this instance for the reason that the ground was