38

39

47

et to that decision,

effect

2.5.

During 1886

The rest

of

the work,

Add verandahs to 11 Station $1,800.

If necessary extend No.6 station

I think might be spread

over three years in the following

order:

During 1884

Build new station at Aberdeen & 12,500.

Reclaim Aberdeen Swamps 3000

Reconstruct No.10 station, Caine Road 13,000

Addition to Hung Hom station 2800

During 1885

Sell = No.10 station at Pakpingshan

and with proceeds rebuild station

on original site. The old

station will pay for the new, cost will

Rebuild No.4 station $800.

During 1886

2100

The minor works in connexion

with No.3 station and the

dilapidated station at Stanley

being so inexpensive might be

undertaken at once

2.6.

In conclusion I beg

to state that although in this preliminary or general report, I have purposely abstained from entering into the details of the various works suggested,

all the

necessary data have

been obtained and detailed

estimates