Defenen of Singapon.

Sen Defence (Military)

509

Jable 1.

((Continued.)

Suchorage in Singapon Roads and town North of River

Batteries Arma Cost of Cost of Total No

Testes Armand Cost

Z

meut

RA.

Remaris.

Janyong Paggar 3-10 140,000 11,200 57,200 68 Me Estimates for

Dock Wall 1-641er

Cutral Fort-6-10" 100,000 20,910 120,910 100||

Jacyong Katong 3-10′′

4-201-12,00 11, 255 23, 255-100

|12-10"

Total.

1-

14-2011

45,365

152,000 40,000|195, 366-

ti

Eutral Fort and Sock Wull battery are very approximate,

Unpossible to frame Any reliable Estimate

till borings have been made of the ground- the summs are placed at higher figures than fare considered

eufficient

| Spot - but it has

been throught beat to leave a wide margin)

fstal. 12-10" guns ML.R. 1-641 to sweep coast of May. 4-20Pre

land side of Janging Katong

2)

If Dock Wall

Battery is not

Constructed

Mount Palmer 2-10"

3,5851

July 1-10" que esti-

meated for. The otters

are comprised in Esti

jas also are the works

5-8517mmate for FiveStarbour

out of works if Bock wall Battery is built ₤152,000.

Armament

43.365-

་་

Sital (1) £

£195,365

if noty 112000

39,780

£151,780

readdition to work required for Defence of New Harbour.

73

34.

JICAMA

Share This Page