Defenen of Singapon.
Sen Defence (Military)
509
Jable 1.
((Continued.)
Suchorage in Singapon Roads and town North of River
Batteries Arma Cost of Cost of Total No
Testes Armand Cost
Z
meut
RA.
Remaris.
Janyong Paggar 3-10 140,000 11,200 57,200 68 Me Estimates for
Dock Wall 1-641er
Cutral Fort-6-10" 100,000 20,910 120,910 100||
Jacyong Katong 3-10′′
4-201-12,00 11, 255 23, 255-100
|12-10"
Total.
1-
14-2011
45,365
152,000 40,000|195, 366-
ti
Eutral Fort and Sock Wull battery are very approximate,
Unpossible to frame Any reliable Estimate
till borings have been made of the ground- the summs are placed at higher figures than fare considered
eufficient
| Spot - but it has
been throught beat to leave a wide margin)
fstal. 12-10" guns ML.R. 1-641 to sweep coast of May. 4-20Pre
land side of Janging Katong
2)
If Dock Wall
Battery is not
Constructed
Mount Palmer 2-10"
3,5851
July 1-10" que esti-
meated for. The otters
are comprised in Esti
jas also are the works
5-8517mmate for FiveStarbour
out of works if Bock wall Battery is built ₤152,000.
Armament
43.365-
་་
Sital (1) £
£195,365
if noty 112000
39,780
£151,780
readdition to work required for Defence of New Harbour.
73
34.
JICAMA