*

506 67

I have to mention that I had no

means of making such accurate esti- mates of the Cost the works as

desirable.

of

are

Tobtained all the information I

could from Capt Me Callum Rr. the Colonial Engineer, and had also as a partial assistance an account of

the cost of the works already executed,

The Lums have been in all cases

kept high, and I do not anticipate that the Estimates as given will be

exceeded, Encept perhaps

in the

Case of the batteries at the Dock

wall, and the Sea Fort in the "Roads"

I have been in communication

with the Colonial auttionties during

the time I have been in Singapor

346

and

Page 510Page 511

Share This Page