376

The modiped estimate of the dam therefore Hong Kong as per

based

on the value of Wirk at Schedule of Prices in the Survepr General's Office

now stands thus :-

lube Rak₤sd

1. Excavation for foundations Cubic yards 18,000 104

750 2. Cement Concrete buse of dam de de 15,000 30,sh 2250000 3. Rubble Masonry dan setin cement de 32.000 20sh 3200000 4. Valvewell

5. Ironwork in valve well fixed.

6. Inlet Culvert.

7. Outlet Culvert.

8. Byewash Capproximate).

9. Gauge basin

5.000 00

1.000 0 0

100|0|0

50000

1.500 00

2000

Total £16355000

Robert Rawlinson

15

2nd August 1882