Schedule A

352

C. O.

12160

RECR

REGP

Approximate Estimate of rock fe52 Machinery required for the Lytam Tunnel Hong Kong Water works.

4 Wathorne's patent rock drills @ £44. Hy ditto dilte ditto for reserve use 44 Columns or standards (hydraulic) @ £21 2 ditto for reserve

woe

2 Air compressors D £250 212. PP steam boilers

0

£300.0.0

300.0

24

0 0

42

Ο 0

L

500

£125

250.

**

0

shall not be able to state whal

2. Air receivers a £85

190

0

h

Portland Cement

-

0 0

A

quantity of

will be required but I will

furnish you this information

very shortly. Meanwhile

arr

as

be made,

angements may independently, for procuring the

#

plant set forth in Schedules t

and B I lose no

time

ins

transmitting you

I have, the,

These enclosures.

Robert Rawlinson

x Sie

24 doyen drill bits a £6 3 sets

of suages for sharpening bits d£1.1.0 400 feel of flexible air hose a) 3/6 2500 yards of 2 iuch iron piping a 3⁄4 16 pairs of hose couplings a 16/ 4 hundred feet of 1/2 much water hose

of

3 3 0

70.0 O 375.0.0 /2 6 0

"

23 6

+

H

30 0

0

+

2 Air Compressing water vessels d£15 2500 yards of such iron water piping @ gl-14-6 Fittings for coupling up

boiler and receiver cocks Is bends reducing sochets the, say Duplicate parts of rock drills, air compressors

Jor

reserve use in case of need, say

Packing and shipping, say,

Total

15.0

0

bo.

£ 2406 « 12 « 0

100. 0 0

X Y

€2586.6

Aste. A percentage should be deducted from The above prices by the makers.