219
has faults of construction
and arrangement.
C.S.O. N° 1634
The Surveyor General.
9th June 1879 asks the Administrator (Mr.
A
aud
R
10th June 1879.
March) to allow him to
postpone the elaboration
of
the Hospital project,
after the expiration of the typhoon season in Septembe
ao
the Praya Wall required the whole of
attention.
his time and
The Administrator approves
and directs that the paper
be laid before
the Governor
C.8.0 N° 1729
his return
The Surveyor General refers
to