a uew

all

cleaned, painted, and tested, replaced and

-securely fastived, all joints aar connections made good and steam tight. eleaurtight: The Engines and Machinery to be thoroughly cleaned, property adjucated, and put in place again, a propeller to be made and fitted, as the present Iron piping connections are to be replaced with – copper and spass. The water Trucks and Goal Kunkers are to be lifted on overhauled cleaved, and painted, than replaced again.

and.

All deficient equipment such as

awning,

and had her tauctions, side, ~.

lamps engine

and -

boiler lacups, oil cans, and oil feeders,

Firing

491

fring tools engine room tools, pamurs, and all racewary fittings, to be preced and put in place

The soliole of the Lanuch pittings, Exactunery and equipment, to be put. uits thorough working order, and ~ completed to the entire satisfaction of the Eovemment Dearinu Runveyor, tla

Buru

Chiguer) R.booke.

Acting Deerehty

Houshory, 21 October 1881

Share This Page