}

Museum in liew

the North Eastern

of

Moiety of

the Chinese Recreation Ground, granted to the Trustees

c.

of

that

Institution, vide C. S.0 No 614 of this

year.

Tracing A shows one

of the

proposed bikes tinted pink, having

are a

of

eight thousand one

81115 09:1

hundred and forty five square feet, and should this site be approved, the new Street shown on the Fracing, will have to be formed sewered, channelled re, by the

Government, and arrangements

made with the Trustees

Stopheus Church,

of

Saint

for the resumption,

of a portion of the Church Compound,

12

273

and for taking down the present

the

school, and rebuilding it ou plot of ground tinted pink, which

it is proposed to give in exchange.

for

the

ground required for the formation of the new Street, the

bank will also have to be excavated

and the site levelled re the total

Cost

of which I estimate approximately

$12000. from twelve thousand to fourteen

$14.000.

thousand dollars.

The construction.

of

the

proposed new Street will open out,

and render available for building purposes, the plots of ground buter. yellow, on the said tracing, the

which is about fifteen thousand

15,000 sq.ft: are a

of

and

equart

#

Share This Page