Page 198

Page 198

(THIS DOCUMENT IS THE PROPERTY OF HIS BRITANNIC MAJESTY'S GOVERNMENT).

TO BE KEPT UNDER LOCK AND KEY.

It is requested that special care may be taken to ensure the secrecy of this document.

This dont was considered at ça.S.(+1) 19′ Meeting.

SECRET.

C.0.S. (41)38.

14TH JANUARY,1941.

29

COPY NO.

WAR CABINET.

CHIES OF STAFF COMMITTEE.

AIR CO-OPERATION FOR LONG RANGE COAST ARTILLERY SITED IN THE DOVER AREA.

Memorandum by the Vice-Chief of the Imperial

General Staff.

1.

The Chiefs of Staff at their 293rd Meeting on 4th September, 1940, approved plans to counteract the German

and to command attempt to master the Dover promontory;

the channel at its marrowest part. These plans involve the installation of equipments in the Dover Area, and details of these are set out below:

Very Long Range Group.

Equipment

Range

Installation

(Yds).

in Progress.

Approx. Date in

Action.

Two 16-inch (if 45,000

No.

Unknown.

available)

Two 14-inch

49,000

Yes

Now

Three 13.5-inch

40,000

Yes

Two now.

One March 1941.

Long Range Group

Two 15-inch

32-35,000

Four 9.2-inch

31,000

Six 3-inch

29,000

Six 6-inch

24,000

Eight 9.2-inch

23,000

(Rly)

2.

September, 1941 April, 1941.

November, 1947

Three now.

Three Feb. 1941.

Five now

Three March 1941.

The main objects for which equipments are being emplaced are:-

(a) To fight

for command in the Straits by Artillery; to destroy the enemy's batteries and multiply and fortify our own.

No

Yes

No

Yes

Yes

-1-

168

38

Page 198

Page 198

Page 198

Share This Page