Page 49

Page 49

Barbed Wire.

Nature of Works.

Table E (ii).-DETAIL of Works to be constructed on Mobilization-continued.

Detail of Working | R. E. Super-

Parties.

Officers.

N.C.Os

and Men.

Coolies.

vision.

Tools Required.

Officers.

and Men.

N.C.Os.

Pickaxes.

Shovels.

Crowbars.

Axes.

*99008-II!I

Sand-bags.

Pliers.

Maule.

Time Required.

Remarks.

CHAPTER III (E).

46

14

15

16

ISLAND SECTION

Defence of cattle pier near Kennedy Town for

20 men

Fire trenches on Mount Davis for 10 men

Water supply for above

#

Rifle pits or saugars at look-out post west of

Mount Davis

Wire Entanglements generally.

Round infantry post on Mount Davis..

In front of rifle pits at look-out post, Mount Davis Fence and entanglements round electric light

emplacements on Praya

Lacing between fences round batteries

Total barbed wire

:

:::

3t 61†

:

:

20

8

1

کت

1

5

20

6

6

:::

:

:::

:::

:::

:::

20

20

NO

2

6

226

4

2

:::

:::

:::

:::

:

6 200

$

:

:

:::

:::

**

1 day

2 days

4 hours

1 hour

For general superintendence in

the Section.

37

pickets

39

plain wire..

17

Position at Sandy Bay Gap for 1 company

18

Clearing in front of 17

19

Nicholson

222

20

Fire trenches at Wong-nei-Cheong Gap

21

Fire trenches at Tytam

22

Preparation of sites for 2-15-pr. guns near

Wong-nei-Cheong and south of

Putting in a state of defence the cable landing

place at Taiwan Bay

:::828

1

50

6

50

10

:::

:: :3 :2

:::

:::

:::

:

200 1,000 3,000

20,000

$5,200

50

:::8

50

10

10

:: 22

5,500

6

1

6

20

30

2

6

Ë:;

1,350

500

2 days

600

4 hours

Mount

1 25

1

38

10

20

50

50

1 30

::

30

888

20

2

5

500

3 days

30

2

2 $1,000

1 day

30

2

2

2 1,000

1

"

23

Putting in a state of defence the cable landing

8

4

4

2

3

500

2 days

place at Deep Water Bay

24

Small redoubt and defences generally, Aberdeen

1

50

50

50

Co

2

552,000

4

..

}"

:

No. of Work.

25 Fire trenches at Mount Kellett

26

"

27

28

29

30

+

39

Sanitarium

Kellett Bay

Deepwater Bay

Repulse Bay Stanley

1

388888:

25

50

50

30

50

50

338888:

25

30

50

30

50

50

388888:

25

3 5

30

50

30

50

50

• NNNN on to

·ANC Sa

3

10 10

100 200

2 days

2

1,000

1 day

3

2

500

2 daysTM

2

4 1,000

4 6 1,000

2

*

:

::

:

:

:

1

20

:

1

20

:::

I

20

Wire required for surrounding gun emplace- ments, defensible buildings, and to formi entanglements in front of trenches

Wire required to surround new magazine with

high wire entanglement, 3 bays deep

Wire required to surround old magazine with

high wire entanglement, 3 bays deep

Total, barbed wire

plain wire pickets

44

*

31* Preparation of site and approach for 2-15-pr. Q.F. on west slopes of Pottinger Peak (height 1,120 feet on map)

32* Preparation of site and approach from Tytam Gap, Lyemun Road, for 2-15-prs. on knoll S.E. of Tytam Gap, and on Boa Vista Road from Tytam Gap to infantry position,

Mount Collinson

38

34 Improvement of existing path from Boa Vista to

Quarry Gap as a gun road

35

Road for infantry from Mount Parker to Quarry

Gap

36 Approach road, and preparation of position for 2-15-pr. guns near Saiwan Redoubt and fire trenches

37

Road from Pottinger Gap to Mount Collinson and

Cape Collinson

38* Trenches on Mount Parker with overhead cover

40 Scarping hillside round infantry position, Mount

98,000

27,000

18,000

143,000

:::

5,200

5,000

200

1 day

For preparation of site and laying

out road.

2 weeks

300

6 hours

2 days

2,300 yards run of road by contract.

100 yards road by contract.

10 days

7 days

:

7

300

1 day

:

1,200 yards run road by contract.

1,200 yards run road by contract.

1,000 yards run road by contract.

To prepare position.

2,500 yards run road by contract.

+ Contractor's tools.

:

:

:

:

:

20

2

:

20

:

:::2

20

20

20

:

20

:::

::

1 week

:

.

30

23

1 6 2,000

6 days

12

5 days

12

1

4

5

6

5

1 2 200

2

:

>

1

4

4

13

10

10

1

2

200

12

12

2

3

4

..

:

1

89

Clearing slopes of Mount Parker

1

Parker

41

Improving existing trenches and 15-pr. Q.F.

positions, Boa Vista

42

Construction of road to site for, and entangle-

28 NN:

:

100

20 200+

20

100

20

100†

ments for 2-5-in. howitzers on Mount Violet

43

Infantry post and entanglements on

Collinson

Mount

1

20

1

25

44 Infantry trenches at Tytam Tuk, covering telephone post with entanglements, and ditto at intervals on Tytam Tuk road

Page 49

:

1 day

2 days

CHAPTER III (E),

31

Page 49

Page 49

Share This Page