Page 46
CHAPTER III (E)
* For general superintendence of works
in vicinity.
2nd Day.
3rd Day.
R.E.
Infantry.
R.E.
Infantry.
Remarks.
Table E (1).—DISTRIBUTION of Working Parties at the Precautionary Stage-continued.
1st Day.
Civilian
Labourers (Cls.).
*squrA
Officers.
Other
Ranks.
Officers.
Other
R.E.
Infantry.
Section, Position, and Nature of Work.
No. of Work,
::
1*
16*
* :
1*
16* 1 50
1* 16*
1
80
::
::
25
1
25
30
1
30
25
1
25
22*
50
22* I
50
50
8
18
19
***
place at Taiwan Bay
20
Fire trenches at Wong-nei-cheong..
21
Island Section-continued.
Fire trenches at Taitam
Putting in a state of defence the cable landing
Small redoubt and defences generally at
Aberdeen
22 Fire trenches at Mount Kellett
23
Fire trenches at Sanitarium
24
Fire trenches at Kellett Bay
25
Putting in a state of defence the cable landing
place at Deepwater Bay
26
Fire trenches at Deepwater Bay
27
Fire trenches at Repulse Bay
28
Fire trenches at Stanley
29
::::
1
888:
30
50
50
ད་
Preparation of site and approach road for 2-18-prs. on west slopes of Pottinger Peak (height 1,120 feet)
30 Preparation of site and approach road for 2-18-pr. guns on knoll south-east of Tytam
::::
8888
1 30
置
50
50
1 20
1 20
Gap and at Boa Vista
31
Road from Tytam Gap to infantry position on
Mount Collinson
32
Improve existing path from Boa Vista to
Quarry Gap into a gun road
33
Approach road and preparation of position for
1 20
2-18-pr. guns near Saiwan Redoubt and
fire trenches
34
Road from Pottinger Gap to Mount Collinson
and Cape Collinson
35
Improve existing trenches and 15-pr. posi-
tions, Boa Vista
20
.
::
::
25
30
:: 88
22*
:
:
::::
:
::
:
:
•
:
:
:
:
:
:
:
:
20
:
.
:
36
Construction of road to site for, and entangle-¦
15
ments for, 2-5-in. howitzers on Mount Violet
37
Infantry post and entanglements on Mount
Collinson
20
38
Infantry trenches at Tytam Tuk covering
telephone post, with entanglements
25
39
40
41
Infantry trench, clearing and entanglements
on Pottinger Peak
D'Aguilar Wireless Station, entanglements
round, and fire trench to command landing, and placing installation in a state of defence Barbed wire fence across land north of Cable
Hut, Devil's Peak
30
1 20
10
•
1
42
Working party for preparation of site and laying out approach road only. Approach road 2,300 yards run by contract-two weeks.
Ditto. Approach road 100 yards run by
contract-two days.
By contract, 1,200 yards run-ten days.
By contract, 1,200 yards run--seven
days,
For preparation of site.
By contract, 2,500 yards run—søven
days.
:
:
23
20
25
:
1
30
Eastern Fire Command.
42
Maxim emplacement, fire treuch, and entangle-
ment at Saiwan Bay
5
43
Entanglement of existing double fence, Saiwan
10
Battery and P.F. Cell
44
Fire trenches commanding Lyemun Bay
5
45
Enclose E. lights with high wire entanglement
12
46
High wire entanglement round Pak-sha-wan
40
Battery
47
20
:
:
10
:
5
•
:
Road by contract.
:
20
20
20
98
40
1
10
High wire entanglement round Brennan directing station, down east side of path to torpedo installation
Entanglements in existing fence round Gough!
48
Battery and P.F. cell
49
50
51
62
53
Entanglements in existing fence round F.C. Post Entanglements in existing fence round Pot-
tinger Battery and P.F.
Mainland Section.
Emplacements for 2-15-prs. and 2—2·95-in.
guns at Chin-lan-chu
Emplacements for 1-5-in. howitzer at Cus-
toms Pass
Fire trenches and blockhouses at-
Devil's Peak
Haiwan
Lau-tong
Chin-lan-chu
Chin-lan-chu Bridge. Customs Hill Customs Pass
:
Page 46
25
25
25
56
25
25
28
•
10
8
In Eastern Fire Command the "Infantry"
R.G. A.”
are really
:::
•
25
25
25
25
25
25
56
56
25
25
25
25
28
28
43
CHAPTER III (E).
29
Page 46
Page 46