the

3.

been concerned in preparing

details

of such work.

Major

2.

Falmer has been

occupied since the middle of last

May

with matters relating

proposed. Observatory such as

53

Estimates for both buildings

He has submitted two

supplementary Séporté

on Obse

Observatory

questions; has been to bauton for

to the

the purpose of finding

a

The preparation

an

d.

publication

of

xx

complete and

elaborate scheme for that

establishment

a

suitable

building material for the Magnetic

Obervatary and has entered into

d.

considerable correspondence with

persons at home and in the East, in the General interests of the project.

the last two month's

During

he has (with any approval) been

occupied with a precise determination of the latitude of the proposed Observator

Site-

at

investigation which

to a

4.

b.

The preparation of designs

and drawings for the Main

Obeurvatory building.

Revision

of design for

Magnetic basement and of

estimates

reccesary

Share This Page