:

Public Works Department

147

Direct Labour Force

λ of 127

Road Maintenance

Chief Technical Officer } vo

R. P. Winter

3-7145211 E 18

Inspectors of Works qv, Cheung Shiu-man 823

Paw lo soinu E 24

Drawing Offices

2017

Senior Technical Officer

(Civil)

District Pool

Cheng Tak-kong pzi Ja. E 28

Capital Works Pool-X

Woo Fat-chi

Chao Chan-hon Law Wai-kwai

Chief Technical Officer Inspector of Works

Chung Hoa-nung

Chu Hok-ching

E 17 ge—E 26

Assistant Inspector of Works

Chow Hon-ping

Depots

Road Depot, Farm Roads Drainage Depot

Jimn

,

B 16

R 3-659257

Chan Hing-wing

E 15

TX ***

1.

L

DAN no nomega"[

Mong Kok & Yau Ma Tei Districts

Engineer

Group 2--Districts Administration' Senior Engineer

gja af te sorte al shbrevet

Lo Chi-on

Judocunt do. 7 Stores

my

gry dƆ Supplies Supervisor II

Tong Wai-ping

E 33

WE 33 1 E 45

AutoVllo woęgnť kod E 15

E 16 3-7145210*

120, 10 imum 3-7110920 (All Hours)

how 20

BEOL

E 04

Chan Cheak-fai

Let M

Kwong Tin-hing

E 29

Jiumenge: 112 brad }

How To to..

Inspector of Works

Pang Tak-cheung

E 32

Kowloon City District

Engineer

W. D. Dixon

E 29

Assistant Inspector of Works Yeung Kwok-chee

E 32

Szeto Hoi

E 23

E 24

Kwun Tong District

Engineer

Mak Wai-pui

E 31

Inspector of Works

Ip Kong-ting.

E 23

E 24

Assistant Inspector of Works

Mui Shui-hang

E 23

E 24

Wong Tai Sin District.

Engineer

Lau Kwing-woon

I JOI

E 21

Inspector of Works

Mak Shek-pang

E 32

Chief Engineer

1

Li Kwing-shuri

Sham Shui Po District

Engineer

Chow King-kee

E 29

Assistant Inspector of Works Leung Chung-man

E 32

Senior Engineer

**» d'Au Yong Chin-koon

(Group 1-Maintenance,

West)

Highways (New Territories) Division

Government Branch Offices,

2nd & 3rd floors, Farm Road, Kowloon

Main Exchange (3-7145211 (Office hours only)

General Enquiries & Complaint ilskjá

Office Hours 3-7145211 After Office Hours 5-26701111 Drainage Complaint 3-7156892

Rainstorm Damage, Typhoons & Emergencies

3-7145221† 3-7145222+

{A—§ qutulak

12,

1 63 T 10.93

E 55 3-7145225† 3-7112626

E 56

3-7145226†

R 5-716085

ا گیا

(1) JA HeWi

SCC LLÚ)

1

Group 3 Capital Works

Senior Engineer

Capital Works 1

Senior Engineer

Leung Chung-shun

12-671578

J. A. Kessler

E 05

(Group 2-Maintenance)

124.

Senior Engineer

Yeung Kin-yee

12

E 46

Engineer

Capital Works 2

Engineer

D. J. Climas

E 37

(Group 3-District)

MA

Senior Engineer

E 37

Inspector of Works

Capital Works 3

Engineer

Ng Choy-leung

Inspectors of Works

Engineer

Capital Works 4

Assistant Engineer

Inspector of Works

Capital Works 5

Engineer

Tsang Yat-pang

Mok Chi-man

M. P. Rudin

B. Lewis Sit ka-yan

Pang May-ah

3-7570611 (Site Office) 3-7570611 (Site Office)

E 43 3-698894

(Site Office) E 38

(Group 4 Capital Works I) Senior Engineer

(Group S---Capital Works II)'' Senior Engineer

(Group 6 Capital Works III), Senior Clerical Officer

Kwong Hon-sang

Wong Hung-kin (ST!

Wong Bing-wing

E 48

』h:

E 67

orqeni istai..

E 61

لادمانا

Accounts & Stores Section

Wong Siu-sun

General Section 5d 2.7.

E 40

Personnel Section

Fok Chi-sum

Mrs. Rose Leung

Ho Wai-fu

E 34

Kong Hin-chiu

E 38

Quantity Surveyor

M. Y. Robertson

Pak Ki E 66 T3-7145222+ E57 3-7145223+ E 59 03-7145221† E 73 c--11.0 313-7145224† OLE 62

Assistant Inspector of Works

P. J. Pearson Chan Kam-chau

E 36

(Quantity)

Survey Section

...

+

Kwan Luen-fai

3-7508592 (Site Office) 3-7508592 (Site Office)

Senior Surveyor Officer 11 Tsang Kai-ming

Land Surveyor (East)

Land Surveyor (West)

Principal Survey Officer. T

love B 63

bur 2 2nd TV

P. G. Harris JE 65 B 77 Cheng Chai-chuen

Tam Cho-lame lo mo, E 78

vamisegnil vaj

:

Capital Works 6 M

(Engineering)

Engineer

Assistant Engineer Inspector of Works

K. C. Lee, Francis

10 E 43

Wai Chi-shing

**** E34

Drawing Section

3

Fung Bing-yiu

Assistant Inspector of Works

Quantity Section

Ho Ming-ori

E 38 3-266718 (Site Office)

Scalor Technical Officer

(Civil)

Mya

Quantity Surveyor pr Senior Survey Officer

Land Surveyor

Principal Survey Officer

L. R. Shaw

E 40

Group 1-Maintenance (West) Senior Engineer

Lam Yiu-chung

B 13

Yuen Long & Tuen Mun

Au Yong Chin-koon glins :')

Survey Section made evalť

Chief Technical Officer

Alexander Zia

E 42

Inspector of Works

D

Chan Pak-shing

E 44

Inspector of Works., f··

Yau Lu-kwan felur E 60

W lo for Ajud

E 56

Yeung Kwok-king 1.3 E 50

Ching Ngau-shiu

TE 71 Ng Ching-tung 14 15 167... E 71

*For use after office hours only. †Rainstorm Damage, Typhoons and Emergencies. - · ́`·

2810W/Vam mogul

Share This Page