The above amounts inciude 10 per cent for Contingencies and are based upon the rates quven in the Appendices attached to the Surveyor General's liemorandum, These rates agree with the War Office Schedule for the execution of contract Work in Hong Kong and It is believed they are sufficient.

تان

Hound n

necessary Kercallar to proleer the entire width of the road Eurface along 11. Prayas East and Westby an

coating of Cconton hydraulic lime

Concrete ite additional cost

would be £ 5, 28 4.

In carrying out the

reconstruction of Praya Central it-

is proposed

by the Survey of

General that there should be

to projecting Stone 9 leps beyond

Othe

Miscellaneous

51

the

of the wall, the requisite face landing accommodation being provided by the introduction of gang way ladders at the existing Limber wharves which are open to the public. - Additional landing facilities light be Alforded hereafter, if thought- desirable, by fixing & est fron

rings," or cast iron ladder frames to the face of

the granite

It is of importance Masonry - It is

that no solid projections should Stand out from the gencral line of the sea face as they would inevitably

tend to concentrate the sea in re entering and les thues intensifying

the mipael

of the waves against the wall during ty phoons, and causing the water to rise in larger

Juasses