The above amounts inciude 10 per cent for Contingencies and are based upon the rates quven in the Appendices attached to the Surveyor General's liemorandum, These rates agree with the War Office Schedule for the execution of contract Work in Hong Kong and It is believed they are sufficient.
تان
Hound n
necessary Kercallar to proleer the entire width of the road Eurface along 11. Prayas East and Westby an
coating of Cconton hydraulic lime
Concrete ite additional cost
would be £ 5, 28 4.
In carrying out the
reconstruction of Praya Central it-
is proposed
by the Survey of
General that there should be
to projecting Stone 9 leps beyond
Othe
Miscellaneous
51
the
of the wall, the requisite face landing accommodation being provided by the introduction of gang way ladders at the existing Limber wharves which are open to the public. - Additional landing facilities light be Alforded hereafter, if thought- desirable, by fixing & est fron
rings," or cast iron ladder frames to the face of
the granite
It is of importance Masonry - It is
that no solid projections should Stand out from the gencral line of the sea face as they would inevitably
tend to concentrate the sea in re entering and les thues intensifying
the mipael
of the waves against the wall during ty phoons, and causing the water to rise in larger
Juasses