of construction for the proposed new Wale, or the extent of repairs sould be required along those portions

C

of the Praya Where it was contemplated

the

to strengthen and mare Govel existing walls; neither were any Alata al- hand as to long it's, quantities, or Creal hates of labour and materials, apon which a

which a satisfactory estimate

'of cost could be based. Hence it was that a Memorandum was attached to the Report of November 1875 describing the nature and extent of the information required. The plans, Sections and Report which accompanied your letter of 22nd with have been prepared in accordance with the

ed in the General idea

conveyed

emorandum referred to above, Although more details have been

furnished

hornished than diere contemplated therein. The ashole of these dată have been transmitted in a most complete and admirable manner by the Survey or General and they assord all the information necessary for a due Consideration of the subject and for Computing the cost of the contemplated works, and will moreover be of &alue hereafter for reference in Connection with all Questions

allecting the sea frontage of Victoria,

As well as in the execution of any works of reconstruction and repair which may now be sanctioned. Further, the depths of water immediating in front of the Sea Wall may be

periodically recorded upon the peers

and Sections with a view to determine the nature and extent of the changes which may