1
north-east bom which quarlows it
Flows most Reavily during or phoons. 과
is also protected from the South. around to Vest buit is then from
open
the latter Quarter to north-east. Dis proposed to shelter the Bay from "This direction by means of an isolated Breakwater 1350 feet in tength hunning west-south-west in an average depth
depth of a beat atlai Water of spring tides and so peaced as to leave an opening,
in 3 yards
3
in width between the north-east- Salientangle of the Eugar Refinere Sea wall on the west side, and an Opening of Similar width Eetween the Low Vater mark and the termination of the Breakwater in the Eastside. - From the Southern low water Margin within the new Harbour tire parallel channels, each of so feet in width would be formid
Communicating
1
22
Communicating through openings to be made in the existing Causeway,
beaching Ground
with the
proposed
at its rear so that boats and light Crast might vitain access thereto
at low water. The works are
J
estimated to cost 50,000 dollars, in sau
£10.
10,500 Sterling. – Dris proposed to do all the unstilled work by conviét labour, shined this mode tir procedure be approved.
There can be no doust Whatever that a Breakwater on the line proposed toned Securely Shelter Causeway Bay, and the provision & an opening at each and of
the work, would not crée
afterd the means of heer access to Harbour When bypioons are Assrehended (a matter of great mo
areal-moment considering the number of crap. to be sheltered, and the ranidite
M