1

north-east bom which quarlows it

Flows most Reavily during or phoons. 과

is also protected from the South. around to Vest buit is then from

open

the latter Quarter to north-east. Dis proposed to shelter the Bay from "This direction by means of an isolated Breakwater 1350 feet in tength hunning west-south-west in an average depth

depth of a beat atlai Water of spring tides and so peaced as to leave an opening,

in 3 yards

3

in width between the north-east- Salientangle of the Eugar Refinere Sea wall on the west side, and an Opening of Similar width Eetween the Low Vater mark and the termination of the Breakwater in the Eastside. - From the Southern low water Margin within the new Harbour tire parallel channels, each of so feet in width would be formid

Communicating

1

22

Communicating through openings to be made in the existing Causeway,

beaching Ground

with the

proposed

at its rear so that boats and light Crast might vitain access thereto

at low water. The works are

J

estimated to cost 50,000 dollars, in sau

£10.

10,500 Sterling. – Dris proposed to do all the unstilled work by conviét labour, shined this mode tir procedure be approved.

There can be no doust Whatever that a Breakwater on the line proposed toned Securely Shelter Causeway Bay, and the provision & an opening at each and of

the work, would not crée

afterd the means of heer access to Harbour When bypioons are Assrehended (a matter of great mo

areal-moment considering the number of crap. to be sheltered, and the ranidite

M

Share This Page