10

is no reason to fear "the silting up of the harbour within it: the suggested mode of construction is also approved, but inasmuch as "it would not be prudent to reckon

"

upon the permanent stability of the

I work unless the slopes are made

flatter than suggested by the Surveyor

"General",

a

very

material atteration.

in the section is recommended.

The point however to which

are

especially

the frown Agents desvions of calling attention, is

that of the estimated cost of the

work.

The figures

are

follows:-

1.

1. Consulting Engineero design

with Breallwater do them in red

on

tracing, but omitting the itres channels of access to beaching.

ground.

2. If survey or General's line

be adopted with Consulting Engineers sections, and channels

omitted.

3.

о

acceso

Surveyor Generali oris.

-inal design with channels

of access

23,200

21,700

n

10, 500.

Some doubt appears to exist-

as to how far the Surveyor_

have counted upon. Several may

being able to utiling convict labor,

but even allowing for

1:

this, and for

V

the increased section recommended

by the Consulting bugineer, it is

difficult