ESTIMATE FOR
SUBMIFIED BY
Appendix C
Combined
128
ON THE
DAY OF
187
ART OF TILDING.
DESCRIPTION OF WORK,
No.
L. B.
D.
CONTENT.
RATE.
AMOUNT.
rought forward & 373. 71
sking Hydraulic line
10.084 2.l
208.4
dway
Concreto
10.06.0
0.
Ꮧ.
2.0 120.0
10.027.01.0
10.0 3.0
15.0
270..
0
6
+
613.4
2.2.12
you 2.00
45.40
amel. 6in: fine quncher.
granite bedded &
jointed in Porstand
Cement.
V
10.0 3.0
30.0
15.00
ital cost for 10 feet of wall and roadwaych
434.11
May
Note: The prices 60 and 40 cents per cubic foot of Masonry land in Portland Cement Mastan be reduced respectively to 52 and 40 cents per Cubre foot if the tamle masonry be laid
Chinese stone lime mortar with Portland Cement Morlan
3 inches inward from the Edge by the Stones.
for
in