ESTIMATE FOR....

SUBMITTED BY

Appendix to Continued

ON THE

DAY OF

125

187

PART OF

UILDING.

DESCRIPTION OF WORK.

No.

P

Inde

B.

D.

CONTENT.

RATE.

Brought forward fo

AMOUNT.

IPS. 20

dway

Puttand ument.

10.06.0

2.0

120.0

Coverete 4 bi

10.0

27.0

180.0

rundt.

10.0 3.0

&

15. 0

$15.0

11. 1747.27

82487

face 6 in fine puncher mel granite bedded &

10.03.0

30.0

50.

15.00

jomited in Portland

lement

tat cash

for to feet of

wall and roadway.

488.09

Share This Page