Appendix A.
119
pr. Sir, I
ESTIMATE FOR the construction of 10 ft tick of Exaya keall as jir Food's disques his talports to logan Arparts of 2.2.0.
fe in figure
23 DAY OF ha
1877
1
4
6
8
9
PART OF BUILDING,
DESCRIPTION OF WORK.
No.
L.
B.
D.
CONTENT,
RATE.
wall Taking down old
masonry
our pemoving old materials 10.0 4.6 10.6 472.6
AMOUNT.
07
9.45
ching Excavating groundin
dway, and removing suphed materials by book.
|10.0|6.6 | 10.6 682.6
10.0 39.0 2.9 1072.
1755.0
L
обертал
16.25
ndations Preavating below dow water and boring rock
10.0 12.6 2.0
250.0
9354
30
4.63
ndations Puntland cement con
crite: 4 to 1, Cavings and labour included
by course) Granite ashlar masonry
Do Set in Portland cement
in blocks sxending left
Cubical content.
|10.012.b 2.0
250.0
937 78 7.27 67 31
10.04.0
2.0
80.0
10.0 3.6 In
671
1117.7
60
88.25
Spasite Ashlan
Set in Bothand
masonry Cement
68° in blocks not extending
15 ft cubical content
2
10.0 16.6 16
1/0-0 4.0 1.6
10.02.6 7.3
10.0 4.0 || 13
37.6
bo. o
62.6
210.0
98
100.80
ing cour
Main labor to face fine dressed
10.01.6
15.0
14
2.10
"The
face of the other courses is lift hough.
288.
·79
Page 120Page 121