Appendix A.

119

pr. Sir, I

ESTIMATE FOR the construction of 10 ft tick of Exaya keall as jir Food's disques his talports to logan Arparts of 2.2.0.

fe in figure

23 DAY OF ha

1877

1

4

6

8

9

PART OF BUILDING,

DESCRIPTION OF WORK.

No.

L.

B.

D.

CONTENT,

RATE.

wall Taking down old

masonry

our pemoving old materials 10.0 4.6 10.6 472.6

AMOUNT.

07

9.45

ching Excavating groundin

dway, and removing suphed materials by book.

|10.0|6.6 | 10.6 682.6

10.0 39.0 2.9 1072.

1755.0

L

обертал

16.25

ndations Preavating below dow water and boring rock

10.0 12.6 2.0

250.0

9354

30

4.63

ndations Puntland cement con

crite: 4 to 1, Cavings and labour included

by course) Granite ashlar masonry

Do Set in Portland cement

in blocks sxending left

Cubical content.

|10.012.b 2.0

250.0

937 78 7.27 67 31

10.04.0

2.0

80.0

10.0 3.6 In

671

1117.7

60

88.25

Spasite Ashlan

Set in Bothand

masonry Cement

68° in blocks not extending

15 ft cubical content

2

10.0 16.6 16

1/0-0 4.0 1.6

10.02.6 7.3

10.0 4.0 || 13

37.6

bo. o

62.6

210.0

98

100.80

ing cour

Main labor to face fine dressed

10.01.6

15.0

14

2.10

"The

face of the other courses is lift hough.

288.

·79

Page 120Page 121

Share This Page