108

been set on

which had gust was dopped under home.

hand

there

orders from

All the clones.

were

for put back temporarily in their original sites without mortar, the joints being only in places pointed

with line.

The pood

where

roadway

however was raised.

necessary to the gradicals

shown in ped in

the longitudinal

Section, with the object of establish

ow new

-ing

without further delay the gear monent levels for the flagged: fool paths which the houser have been laying down in pout of their premises.

remises. Dus

places

ů

many

trenchs & feet wider was duz under the silei

of

the street

Jutters shown in Drawings

25 and

25. A.

255 A and filled with a

depths

of

hiro foot

lime conerite with the hoo

Jutro

fold object of affording temporary protichon to the pavements qust

foundation for the.. voussoir stones that form the struct Gutters.

koned and at a

Along the Traya Central, in those plaus

where the old portions of the walli

it

was deemed uselesa

gave way Expenditure to begin

consin

derable work of repair and nothing dove than rebuilding the

more

wall dry and bonding repeatedly with the fine larger & guared

which for..

med

blocks.

d the dwarf parapel of

the same wall and thats of

Praya

it's

West which

W by

the

obupped of

parapet for the purposes

рагарей

Share This Page