89

however it should now

be added

that after consultation with this De- partment, the

OW KI

with the most

commendable spirits had already in 1875 paised this floors at their

expense to record with the

dicats. So that

proposed futures quadients.

when the

works are

completed

the

no doors will be left below

The type of masonry along

the

por.

4.1, and the

general.

condition

hous coloured yellow in Drawing

1

of the wall after the

able

already desa

typhoon having been already

cribed, an outline specification of the proposed work of pestoration

briefly classified

MAY

be at

A J

follows :

(1) Resetting of

the

upper

where

: where damaged, and raising the exping level to the red live shewn in the Longitudinal Sec-

tion.

(1) Raking out and commits ponit-

ing of all joints along the face

of

the wall.

(11) Backing the wall with dydran-

he time concreter

as shown in

Prawings h° 25+ 25A.

(1) Raising the roadway to

respond with the altered levels of the coping course, concertingg

the se

surface, and paising

levels of

Resitting

the abu

abutting

the

streets.

asonry

and

raising Coping Course.

All the stones loosened pe

displaced

will

Page 90Page 91

Share This Page