will be taken to deposit the concrete

Where

there

three feet of water in the trench it will be lowered. boxes with moveable, bottoms, as was done with success in the deeper foun the ashlar and concrete pur of

1875 opposite the

Central

dations.

bult in

Market

Masonry

The concreter being finished at how water and having set hard,

it is

is proposed to raise upon it. nine inches back from the face,

the

JAL (S

ashlar

masoury

to be baid

header and stretches in Flemish

bond with a

The stone will be

butter of

in 12.

sound close.

:

grained: gruz granite pee from discolor

grey ation or other marks of disintegration. The courses will be from two feits to foot three inches thick, bricking

tve...

so that each header shall pests

coint so

joint

about the middle of a stretcher off

the

course below.

The stones will be

squared, ands rough dressed to plane surfaces with shoup arrises and mißem form bed and side joints. Their faces will be fine dressed but the lails of headers

and the backs

where

of

the

they

a but

inner stretchers.

inst the concreto

against

backing will be left: rough. The foot-

ing courses resting

will be of

the concrite

headers 5 fut le inches

long and not less than 2 fut le inches wide in their external faces,

they

will project to inches beyond the

grained